Skip to content
Search a product, a reference...

RUG - S015 - Reinforced mounting base for FLOW heads - Nexelec

SKU: SPW-1401009
Sale price9,00€ excl. tax

The RUG S015 base strengthens the attachment of a FLOW thermostatic head to a valve in multi-unit buildings where equipment is subject to heavy use.
• Reinforced base with metal inserts in high-stress mounting areas.
• Installed between the FLOW thermostatic head and the thermostatic valve.
• M30 × 1.5 mm radiator interface.
• Material: reinforced engineering polymer with metal inserts.
• Sold individually.

Out of stock

Specific project or quantity requirement?

For a multi-site deployment, a specific technical requirement or a volume order, please contact us for tailored advice or a customised offer.

Contact us

CREATE YOUR ACCOUNT AND DISCOVER OUR SPARWAN ADVANTAGES

Dedicated Sales Representative

Sourcing and Consulting

Partner Rates

and volume discounts

Payment Terms

suited for pros

View my configuration

Reinforced mounting for FLOW thermostatic heads

The Nexelec RUG S015 base reinforces the mounting of FLOW thermostatic heads with metal inserts, particularly in high-use multi-unit environments. In residential complexes, schools, or commercial buildings, a thermostatic head can be handled frequently. RUG S015 reinforces the attachment of a FLOW head to the valve. Its metal inserts occupy the most stressed mounting areas.

For a facility manager, the goal is to limit mounting damage and corrective maintenance without confusing this accessory with a control device. The base does not control the heating on its own.

A mechanical accessory designed for intensive use

RUG is installed between the FLOW thermostatic head and the valve, for an M30 × 1.5 mm radiator interface. For deployment, record the valve specifications and check the heads before standardizing this assembly in the building.

A mechanical interface does not guarantee universal compatibility with existing installations. The value of the accessory lies in the durability of the assembly on site, not in a radio or software function.

Installation suited for multi-unit buildings

The base allows you to address the mounting during installation or a targeted intervention. On high-use sites, document the equipped locations to help maintenance identify the assembly. Check the mounting and the operation of the head after installation according to the project procedures.

Specifications

Mounting Type
Between the FLOW thermostatic head and the thermostatic valve
Application
Smart Building and Smart Office
Reinforced RUG mounting base for FLOW head